Skip to content
← Services
BizTalk Migration Fixed-price assessment + waves

BizTalk has an end date. Your plan should too.

BizTalk Server 2020 mainstream support ends in April 2028 and extended support in April 2030. A well-run migration takes 12 to 18 months. We start with a fixed-price migration assessment and move your flows to Azure in low-risk waves.

Mainstream ends

Apr 2028

Extended ends

Apr 2030

  • OrchestrationsLogic Apps
  • MessageBoxService Bus
  • Maps & schemasIntegration Account
  • BAMAzure Monitor
  • EndpointsAPI Management
Mainstream support ends
April 11, 2028
Extended support ends
April 9, 2030
Typical migration
12–18 months
Entry point
Fixed-price migration assessment

BizTalk Migration

Why not lift-and-shift

01

Copying every orchestration moves your technical debt to the cloud.

02

Many flows are unused or duplicated and should be retired, not migrated.

03

Batch file drops can become APIs and events that Dynamics 365 and AI agents can use.

04

Monitoring and cost need to be designed up front, not discovered later.

At a glance

Migration assessment includes

  • Inventory of applications, orchestrations, ports and dependencies
  • Rationalization: retire, simplify, modernize
  • BizTalk → Azure mapping for every component
  • Target Azure Integration Services architecture
  • Wave-by-wave migration plan with effort estimates
  • Monitoring, alerting and cost model

Five steps, no big bang

  1. 1

    Inventory

    Every application and dependency, with real usage.

  2. 2

    Rationalize

    Retire, simplify, modernize.

  3. 3

    Design

    Azure reference architecture.

  4. 4

    Migrate in waves

    In parallel until each wave is proven.

  5. 5

    Decommission

    Switch off servers and licenses.

FAQ

Questions we often hear.

Where do BizTalk components go in Azure?+

Orchestrations → Logic Apps; MessageBox pub/sub → Service Bus topics; maps → Integration Account or Functions; BAM → Azure Monitor; endpoints → API Management. The assessment decides per flow.

Can we keep BizTalk running during the migration?+

Yes. Each wave runs in parallel with BizTalk until it’s proven, then the old flow is switched off.

Source for the dates?+

Microsoft Lifecycle policy for BizTalk Server 2020.

Contact

Let’s talk about BizTalk Migration.

A few lines about your systems and what’s not working is enough. We reply personally.

  1. 01We read every message personally.
  2. 02A 30-minute call to understand your context.
  3. 03A clear proposal, fixed scope whenever possible.